Drafting & Deliverables Workflow

Category: Technical | Last Updated: February 27, 2026 | Author: May (draft — pending Brian review)

Board: Active Jobs (5765387029) — Groups: Drafting, Contract Drafting, Drafting Review, PLS Approved, Submit to Municipality, Client/Weygand Signatures

This SOP covers the workflow. For CAD standards, layer naming, title block requirements, and QC checklist, see Drafting & CAD Standards.


Triggers

Drafting begins when an item on Active Jobs board is:

  • Group: Drafting
  • Status: Drafting
  • Drafting Assigned: drafter set
  • Field Files: raw data uploaded
  • Field Work Completion Date: set

Step 1: Drafter Receives Assignment

  • Review job in Monday.com:
    • Job type (from Job Type column)
    • Scope of Work document
    • Field notes and raw data in Field Files
    • Municipality requirements (if applicable)
    • Any crew notes or anomalies flagged during field work
    • Closing date or urgency indicators
  • Access Google Drive folder (Google Drive Link column) for file storage

Step 2: Drafting Work

Drafting Status: (working)

  • Follow Drafting & CAD Standards for:
    • File naming convention ([JobNumber]_[Suffix]_[Rev].dwg)
    • Layer standards and color assignments
    • Text standards (bearings, distances, font)
    • Title block requirements
  • Upload working files to Drafting Files column as work progresses
  • If blocked: set Drafting Status: Stuck Need Help and notify PM / party chief

If client information is missing:

  • Drafting Status: Need Client Info
  • Item moves to Waiting on client group while awaiting response

Step 3: Contract Drafting (select jobs)

Status: Contract Drafting | Group: Contract Drafting

For jobs requiring formal contract documents (subdivisions, plats, complex easements):

  • Separate group and status for this workflow stage
  • [QUESTION: What distinguishes a “Contract Drafting” job from standard drafting? Who decides?]

Step 4: Drafting Complete — Internal Review

Drafting Status: Needs Review | Group: Drafting Review

When drafter completes the drawing:

  • Set Drafting Status: Needs Review
  • Move item to Drafting Review group
  • Status: Drafting Review
  • Self-QC checklist per Drafting & CAD Standards — QC Checklist section:
    • Bearing closures within spec (1:10,000 minimum)
    • All found/set monuments labeled
    • Deed vs. field bearings noted where different
    • Title block complete and accurate
    • Scale bar + north arrow present
    • PDF exported at minimum 300 DPI

Step 5: PLS Review & Approval

Status: Jeff Approved | Group: PLS Approved

  • PLS (Jeff or designated RPLS) reviews for Alabama Standards of Practice compliance
  • Boundary surveys, ALTAs, record maps: PLS review required before delivery
  • Status: Jeff Approved when PLS approves
  • If corrections needed: Status: CORRECTIONS MADE after fixes applied
  • Final Stamp Date set when seal/signature affixed
  • Drafting Completion Date set

[QUESTION: What is the standard workflow when corrections are needed after PLS review? Back to drafter → re-review?]


Step 6: Municipality Submission (if required)

Status: Submitted with Municipality | Groups: Submit to Municipality, Awaiting Municipal Comments

For jobs requiring municipal review (plats, subdivisions, some record maps):

  • Move to Submit to Municipality group
  • Status: Submitted with Municipality
  • Map Location column: set to Municipality
  • Track physical map location as it moves between offices

If comments received:

  • Group: City Revisions Needed / Need to Address city comments
  • Revisions made by drafter
  • Status: CORRECTIONS MADE when resolved
  • Re-submit or obtain approval

Special paths:

  • Environmental review: Take to/ Pick up from Environmental group
  • Record maps: Record Maps In ProcessTake Maps to MunicipalityRecorded YAAYYY
  • Construction packages: Construction Packages in progress group

[QUESTION: Who manages the physical map tracking? Liza? Office manager?]


Step 7: Signatures

Status: Ready for Signatures / Sign & Send | Groups: Client/ Weygand Signatures, Municipality Signatures, Weygand/ Client Signatures

For jobs requiring formal signatures:

  • Route to appropriate signature group based on who signs first
  • Review Requested column: Sent / DONT SEND / Unsure
  • Track which party has the documents currently

Step 8: Final Deliverable

Status: Sign & Send | Group: Pre Completion

When drafting is complete, reviewed, stamped, and all signatures obtained:

  • Final deliverable (PDF / DWG) attached to Final Deliverable column
  • Final Stamp Date confirmed
  • Drafting Completion Date confirmed
  • Move to Pre Completion group
  • Status: Hold for Complete

Deliverable types by job:

  • Boundary survey: stamped PDF plat
  • ALTA survey: stamped PDF + ALTA certification
  • Topo: DWG/PDF drawing + contours
  • Elevation cert: FEMA form + stamped drawing
  • Staking: field notes / report only (no plat)
  • Record map: recorded copy from municipality

Drafting Status Reference

Drafting StatusMeaning
(no status set)Not yet started
Needs ReviewDrafter complete — awaiting review
DoneDrafting fully complete
Stuck Need HelpBlocked — needs PM or party chief input
Need Client InfoWaiting on information from client

Previous step: Field Operations Workflow Next step: Invoicing & AR Process